References

No.Name of design documentationDesign YearInvestor /Purchaser
1
Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 28, from node 2321 to node 2812, Susica-boarder SRB/BIH(Kotroman) (L=36.365km)
2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
2

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 21, from node 2122 to node 2123, Slatina – Valjevo
(Brankovina) (L=15.703km)

2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
3

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 21, from node 2124 to node 2126, Valjevo(bypass) - Kaona (L=28.943km)

2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
4

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 21, from node 2126 to node 2128, Kaona - Kosjeric (L=16.959km)

2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
5

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 35, from node 3521 to node 3522, Knjazevac – Svrljig (L=28.197km)

2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
6

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 35, from node 3522 to node 3525, (Malca(put 259)) (L=16.615km)

2025Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
7

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 23, from node 2321 to node 2325, Susica – Kokin Brod(Zlatarsko jezero) (L=39.784km)

2024Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
8

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 23, from node 2325 to node 2330, Kokin Brod (Zlatarsko jezero)- Mijoska (L=39.227km)

2024Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
9

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 23, from node 2330 to node 2331, Mijoska – boarder SRB/MNE (Gostun) (L=30.176km)

2024Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
10

Analysis of the available sight distance with a proposal for measures to eliminate deficiencies on the part of DP IB number 38, from node 3803.1 to node 3533, Krusevac-Beloljin (L=55.371km)

2024Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
11

Analysis of available sight distance with a proposal for measures to eliminate defects on the part of the state road IB-22 from node 223 to node 2229, Kraljevo (Jarcuujak)-Raška (Kosovska Mitrovica) (L=78.4km)

2023Vojvodina put a.d. for PE ’’Roads of Serbia‘‘
12

Technical control of project documentation for the realization of the project of the fast road IB level, Highway E75 Belgrade - Nis (Pozarevac) - Pozarevac -Veliko Gradište - Golubac (Danube Corridor) L =23.075 km

2023Corridors of Serbia
13

Analysis of available sight distances on the road M7 (M6) I R-11,with proposal of measures to eliminate deficiencies and Design correction of horizontal and vertical signalization in accordance with short-term measures proposed in the Analysis, sections Trubjela – Vilusi: 5,7 km, Vilusi – Osječenica 5,4 km 

2023The Government of Montenegro
14

Technical documentation for the construction of roads and public areas with infrastructure in the Sava River Basin within the project "Belgrade Waterfront" - New Belgrade, all design phases for the street Vladimir Popović,  from Boulevard Mihajlo Pupin to Boulevard Zoran Đinđić, and street Boulevard Zoran Đinđić from Vladimir Popović street, to Milentije Popović street.

2023Belgrade Land Development Public Agency
15Detailed Regulation Plan and Preliminary Design with Feasibility study of reconstruction and construction of the State road IB 19, section: Neštin - Vizić - Erdevik from km 0+000 to km 13+700 (L=13,70km) 2023PE "Roads of Serbia"
16Preliminary Design with Feasibility study of relocating the State road IB 29 (before M-8) Novi Pazar - Sjenica, section: Bele Vode - Golijski Put (L=9,22km) 2023PE ’’Roads of Serbia‘‘
17

Main Designs for heavy maintenance (road rehabilitation - upgrading) of the State roads:

LOT 1: IA 1: Brestovac (interchange)- Doljevac (interchange), L=6,102 km,
LOT 2: state road IB22, Ušće- Raška (Kosovska Mitrovica), L=32,127 km
LOT 3: state road IB22 NovI Pazar (Brdjani)-Ribariće L=24,360 km

2023PE ’’Roads of Serbia‘‘
18

Road Safty Audit of Preliminary Design of new cemetery access roads on State Road IB 10

2022The City of Vrsac
19

As built design for heavy maintenance (road rehabilitation-upgrading) of the state road IA 3: Sremska Mitrovica interchange-Ruma Interchange L=13,75 km

2021Depart of Integral Engineering
20

As built design for heavy maintenance (road rehabilitation-upgrading) of the state road IA 3: Sremska Mitrovica interchange -Ruma Interchange (left carriageway line) L=13,75 km i interchange Ruma - interchange Pećinci (right carriageway line) L=13.098 km

2021Depart of Integral Engineering
21Changing the Spatial plan of the infrastructure corridor: Highway E-75 Subotica-Belgrade (Batajnica) 2020PE ’’Roads of Serbia‘‘
22As Built design, Detailed Design and Changing in the Design for building permit for the completion of Interchange Batajnica – Belgrade Bypass 2020Strabag DOO
23Damage Repair Project on the section of Highway E-763 Belgrade – South Adriatic, section Ub – Lajkovac from km 40+645.28 to km 53+139.91 2019Starbag DOO - branch PZP Beograd
24Damage Repair Project on the Interchange Lajkovac on the section of Highway E-763 Belgrade – Pozega, Sector 1 Belgrade - Ljig, section 4, Ub – Lajkovac, km 40+645,28 – km 53+139,9 2019Company for roads BELGRADE
25Preliminary design for interchange Gramanje on the E-75 highway 2018Corridors of Serbia
26Conceptual design , Preliminary design ,Design for building permit for the completion of Interchange Batajnica – Highway Е75, Belgrade Bypass 2018PE ’’Roads of Serbia‘‘
27

Main Designs for heavy maintenance (road rehabilitation - upgrading) of the State roads IA 1, IB 33, IB 39 and IIA 186

LOT1: IA 1, Nis1 (Trupale) - Nis3 (Batušinac), L= 9.206 km i Nis3 (Batušinac)- Nis1 (Trupale), L= 9.449 km
LOT2: IB33, Negotin (Radujevac)- gr. SRB/BUG (Mokranje), L= 12.919 km
LOT3: IB39, Babusnica - Svođe, L= 19.519 km
LOT4: IIA 186, Ćuprija (Despotovac)- Despotovac, L= 21.440 km

2018PE ’’Roads of Serbia‘‘
28Previous feasibility study with the General project for the construction of the road Mirkovci - Jabučko Ravnište on Stara planina 2017Municipality of Knjazevac
29

Main Design for Heavy Maintenance (Road Rehabilitation - Upgrading) of the State Road IB 15, LOT 1: Kula (Bačka Topola) - Vrbas (Savino Selo), L=10.156 km, and LOT 2 2: Vrbas (Zmajevo) - Srbobran (Feketić) L=9.492 km

2017PE ’’Roads of Serbia‘‘
30Main Design for Heavy Maintenance (Road Rehabilitation – Upgrading) of the State Road IB 23/28, Section: Kneževići – Bela Zemlja – Užice 3, L= 15.234 km. 2016PE ’’Roads of Serbia‘‘
31Main Design for Heavy Maintenance (Road Rehabilitation - Upgrading) of the State Road IB 39, Section: Vlasotince – Svođe, L= 12.510 km 2016PE ’’Roads of Serbia‘‘
32Preparation of technical documentation for construction of a tunnel under Kadinjaca Mountain, Location- Republic of Serbia 2015European Union, Delegation of the European Union to the Republic of Serbia
33Detail Design for relocation of state magistral road IA 2 (old designation M-22) Belgrade – Ljig, on the area of exploatation of surface excavation in mining basin Kolubara, L=7.247km 2014Company for production, processing and transportation Coal, “MINING BASIN KOLUBARA” d.o.o. Lazarevac
34As-built design for traffic signalization and equipment of the Ia phase of the inner city semiring (UMP): Loop “Hipodrom”, section of UMP from railway crossing to interchange “Hipodrom”, connection of UMP with existing Boulevard Vojvode Mišića, section of Požeška street from interchange “Hipodrom” to connecting ramps with Paštrovićeva street, as well as ramps Požeška – Paštrovićeva i Paštrovićeva – Požeška 2014Belgrade Land Development Public Agency / „RATKO MITROVIĆ – Niskogradnja“ d.o.o
35As-Built design of the rhabilitation of state road IB 24 (old designation M-5) from km 789 +456.00 to km 808+135.92 2013PE ROADS OF SERBIA / „RATKO MITROVIĆ-NISKOGRADNJA“ D.O.O
36Main design for reconstruction of the street Paštrovićeva on the part of the Visoka street, to street Požeške 2012KOLUBARA” d.o.o. Lazarevac
37Technical control of the design for the construction of access roads for complex distribution center along the highway E-75 in Novi Sad, in the grounds of 3296/1, 3176/2, 287/16, 287/28, 287/2, 190/4, 190/2 K.O.Novi Sad III phase 1 2013Niskogradnja“ d.o.o
38The main design for the construction of the pedestrian gangway locations: Round-trip detour to Resnik,Tempo-Ada Ciganlija 2012City of Belgrade, Secretariat for Transport
39

Addition of main design for section of the E-75 and E-80 construction project and installation of equipment at toll plazas:

- E80, section 7 Sukovo - Dimitrovgrad (frontal toll gate "Dimitrovgrad")
- E75 Grabovnica - Grdelica (side toll plazas in the loop "Grdelica")
- E75 Gornje Polje - Caričina Dolina (lateral toll gate in the loop "Predejane")
- E75 Vladičin Han - Donji Neradovac (side toll plazas in the loop "Vranje")
- Donji Neradovac E75-Srpska kuća (side toll plazas in the loop "Bujanovac 1")
- E75 Srpska kuća - Levosoje (side toll plazas in the loop "Bujanovac 2")

2012Corridors of Serbia
40The main design fro improvement of the crossing of the national road IB 24 (old mark of M-5) at km 791 +185.64, with Obilić Street in Boljevac 2012PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O
41Project documentation to improve three crossings of state road IB 24 (old designation M-5) and in Boljevac street, and the AMSS terminal section from km 789 +456 to km 791 +185, within the rehabilitation project of upgrading the highway M-5, section Boljevac-Selište-km of 789 +456 to km 807 +874 2012PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O
42The main designin of the lighting at thethree intersections of national road IB 24 (old designation M-5) and in Boljevac street, and the AMSS terminal section from km 789 +456 to km 791 +185, within the rehabilitation project of upgrading the highway M-5, section Boljevac-Selište-km of 789 +456 to km 807 +874 2012PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O
43Technical control of the project to improve the national road intersections of second order number 102 (formerly State first-order time-highway M-22, 1) and Šajkaška street in Novi Sad 2012PE ’’Roads of Serbia‘‘
44Conceptual design of crossing the Adriatic-Ionian motorway Bar-Boljare: Strganice in the zone and the zone Smokovac 2012The Municipality of Podgorica
45The main project of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 2011PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O
46The main design of the preparatory work for the preliminary and detailed design of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 2011PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O
47Preliminary design of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 2011PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O

Our Clients