References
No. | Name of design documentation | Design Year | Investor /Purchaser |
---|---|---|---|
1 | Analysis of available sight distance with a proposal for measures to eliminate defects on the part of the state road IB-22 from node 223 to node 2229, Kraljevo (Jarcuujak)-Raška (Kosovska Mitrovica) (L=78.4km) | 2023 | Vojvodina put a.d. for PE ’’Roads of Serbia‘‘ |
2 | Technical control of project documentation for the realization of the project of the fast road IB level, Highway E75 Belgrade - Nis (Pozarevac) - Pozarevac -Veliko Gradište - Golubac (Danube Corridor) L =23.075 km | 2023 | Corridors of Serbia |
3 | Analysis of available sight distances on the road M7 (M6) I R-11,with proposal of measures to eliminate deficiencies and Design correction of horizontal and vertical signalization in accordance with short-term measures proposed in the Analysis, sections Trubjela – Vilusi: 5,7 km, Vilusi – Osječenica 5,4 km | 2023 | The Government of Montenegro |
4 | Technical documentation for the construction of roads and public areas with infrastructure in the Sava River Basin within the project "Belgrade Waterfront" - New Belgrade, all design phases for the street Vladimir Popović, from Boulevard Mihajlo Pupin to Boulevard Zoran Đinđić, and street Boulevard Zoran Đinđić from Vladimir Popović street, to Milentije Popović street. | 2023 | Belgrade Land Development Public Agency |
5 | Detailed Regulation Plan and Preliminary Design with Feasibility study of reconstruction and construction of the State road IB 19, section: Neštin - Vizić - Erdevik from km 0+000 to km 13+700 (L=13,70km) | 2023 | PE "Roads of Serbia" |
6 | Preliminary Design with Feasibility study of relocating the State road IB 29 (before M-8) Novi Pazar - Sjenica, section: Bele Vode - Golijski Put (L=9,22km) | 2023 | PE ’’Roads of Serbia‘‘ |
7 | Main Designs for heavy maintenance (road rehabilitation - upgrading) of the State roads: LOT 1: IA 1: Brestovac (interchange)- Doljevac (interchange), L=6,102 km, | 2023 | PE ’’Roads of Serbia‘‘ |
8 | Road Safty Audit of Preliminary Design of new cemetery access roads on State Road IB 10 | 2022 | The City of Vrsac |
9 | As built design for heavy maintenance (road rehabilitation-upgrading) of the state road IA 3: Sremska Mitrovica interchange-Ruma Interchange L=13,75 km | 2021 | Depart of Integral Engineering |
10 | As built design for heavy maintenance (road rehabilitation-upgrading) of the state road IA 3: Sremska Mitrovica interchange -Ruma Interchange (left carriageway line) L=13,75 km i interchange Ruma - interchange Pećinci (right carriageway line) L=13.098 km | 2021 | Depart of Integral Engineering |
11 | Changing the Spatial plan of the infrastructure corridor: Highway E-75 Subotica-Belgrade (Batajnica) | 2020 | PE ’’Roads of Serbia‘‘ |
12 | As Built design, Detailed Design and Changing in the Design for building permit for the completion of Interchange Batajnica – Belgrade Bypass | 2020 | Strabag DOO |
13 | Damage Repair Project on the section of Highway E-763 Belgrade – South Adriatic, section Ub – Lajkovac from km 40+645.28 to km 53+139.91 | 2019 | Starbag DOO - branch PZP Beograd |
14 | Damage Repair Project on the Interchange Lajkovac on the section of Highway E-763 Belgrade – Pozega, Sector 1 Belgrade - Ljig, section 4, Ub – Lajkovac, km 40+645,28 – km 53+139,9 | 2019 | Company for roads BELGRADE |
15 | Preliminary design for interchange Gramanje on the E-75 highway | 2018 | Corridors of Serbia |
16 | Conceptual design , Preliminary design ,Design for building permit for the completion of Interchange Batajnica – Highway Е75, Belgrade Bypass | 2018 | PE ’’Roads of Serbia‘‘ |
17 | Main Designs for heavy maintenance (road rehabilitation - upgrading) of the State roads IA 1, IB 33, IB 39 and IIA 186 LOT1: IA 1, Nis1 (Trupale) - Nis3 (Batušinac), L= 9.206 km i Nis3 (Batušinac)- Nis1 (Trupale), L= 9.449 km | 2018 | PE ’’Roads of Serbia‘‘ |
18 | Previous feasibility study with the General project for the construction of the road Mirkovci - Jabučko Ravnište on Stara planina | 2017 | Municipality of Knjazevac |
19 | Main Design for Heavy Maintenance (Road Rehabilitation - Upgrading) of the State Road IB 15, LOT 1: Kula (Bačka Topola) - Vrbas (Savino Selo), L=10.156 km, and LOT 2 2: Vrbas (Zmajevo) - Srbobran (Feketić) L=9.492 km | 2017 | PE ’’Roads of Serbia‘‘ |
20 | Main Design for Heavy Maintenance (Road Rehabilitation – Upgrading) of the State Road IB 23/28, Section: Kneževići – Bela Zemlja – Užice 3, L= 15.234 km. | 2016 | PE ’’Roads of Serbia‘‘ |
21 | Main Design for Heavy Maintenance (Road Rehabilitation - Upgrading) of the State Road IB 39, Section: Vlasotince – Svođe, L= 12.510 km | 2016 | PE ’’Roads of Serbia‘‘ |
22 | Preparation of technical documentation for construction of a tunnel under Kadinjaca Mountain, Location- Republic of Serbia | 2015 | European Union, Delegation of the European Union to the Republic of Serbia |
23 | Detail Design for relocation of state magistral road IA 2 (old designation M-22) Belgrade – Ljig, on the area of exploatation of surface excavation in mining basin Kolubara, L=7.247km | 2014 | Company for production, processing and transportation Coal, “MINING BASIN KOLUBARA” d.o.o. Lazarevac |
24 | As-built design for traffic signalization and equipment of the Ia phase of the inner city semiring (UMP): Loop “Hipodrom”, section of UMP from railway crossing to interchange “Hipodrom”, connection of UMP with existing Boulevard Vojvode Mišića, section of Požeška street from interchange “Hipodrom” to connecting ramps with Paštrovićeva street, as well as ramps Požeška – Paštrovićeva i Paštrovićeva – Požeška | 2014 | Belgrade Land Development Public Agency / „RATKO MITROVIĆ – Niskogradnja“ d.o.o |
25 | As-Built design of the rhabilitation of state road IB 24 (old designation M-5) from km 789 +456.00 to km 808+135.92 | 2013 | PE ROADS OF SERBIA / „RATKO MITROVIĆ-NISKOGRADNJA“ D.O.O |
26 | Main design for reconstruction of the street Paštrovićeva on the part of the Visoka street, to street Požeške | 2012 | KOLUBARA” d.o.o. Lazarevac |
27 | Technical control of the design for the construction of access roads for complex distribution center along the highway E-75 in Novi Sad, in the grounds of 3296/1, 3176/2, 287/16, 287/28, 287/2, 190/4, 190/2 K.O.Novi Sad III phase 1 | 2013 | Niskogradnja“ d.o.o |
28 | The main design for the construction of the pedestrian gangway locations: Round-trip detour to Resnik,Tempo-Ada Ciganlija | 2012 | City of Belgrade, Secretariat for Transport |
29 | Addition of main design for section of the E-75 and E-80 construction project and installation of equipment at toll plazas: - E80, section 7 Sukovo - Dimitrovgrad (frontal toll gate "Dimitrovgrad") | 2012 | Corridors of Serbia |
30 | The main design fro improvement of the crossing of the national road IB 24 (old mark of M-5) at km 791 +185.64, with Obilić Street in Boljevac | 2012 | PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O |
31 | Project documentation to improve three crossings of state road IB 24 (old designation M-5) and in Boljevac street, and the AMSS terminal section from km 789 +456 to km 791 +185, within the rehabilitation project of upgrading the highway M-5, section Boljevac-Selište-km of 789 +456 to km 807 +874 | 2012 | PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O |
32 | The main designin of the lighting at thethree intersections of national road IB 24 (old designation M-5) and in Boljevac street, and the AMSS terminal section from km 789 +456 to km 791 +185, within the rehabilitation project of upgrading the highway M-5, section Boljevac-Selište-km of 789 +456 to km 807 +874 | 2012 | PE ’’Roads of Serbia‘‘ / „RATKO MITROVIĆ- Road construction“ D.O.O |
33 | Technical control of the project to improve the national road intersections of second order number 102 (formerly State first-order time-highway M-22, 1) and Šajkaška street in Novi Sad | 2012 | PE ’’Roads of Serbia‘‘ |
34 | Conceptual design of crossing the Adriatic-Ionian motorway Bar-Boljare: Strganice in the zone and the zone Smokovac | 2012 | The Municipality of Podgorica |
35 | The main project of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 | 2011 | PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O |
36 | The main design of the preparatory work for the preliminary and detailed design of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 | 2011 | PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O |
37 | Preliminary design of the E-75, Novi Sad-Belgrade-Nis Section: Batajnica-Dobanovci LOT A1'' Loop'' Batajnica, from km 184 to km 188 +738.24 +680.00 | 2011 | PE ’’Roads of Serbia‘‘ / JV GP „PLANUM“ A.D & „RATKO MITROVIĆ- Road construction“ D.O.O |